Determine shoreline and bank quantities from the required armor-stone layer depth, rather than the shallow depths used for landscape rock.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches
Add 5% extra for compaction & spillage

A ton of riprap covers roughly 17 square feet. That figure reflects the deep layers required for armor stone, commonly 12 inches or more, rather than the shallow spread used for landscape rock. This calculator uses layer depth and a density of 3,100 lb per cubic yard for material generally sized 4 to 12 inches and larger.

Measuring an armored bank

  1. Follow the tape along the bank face instead of measuring level ground, then multiply that distance by the channel or shoreline length.
  2. Set the rock layer at 1.5 to 2 times the dimension of the largest stone. For erosion control, use no less than 12 inches.
  3. To find cubic yards, divide cubic feet by 27; then multiply by 1.55 for tons.
Tons = (Slope-face area sq ft × Layer thickness in ÷ 12) ÷ 27 × 1.55

Tons and coverage

Layer thickness1 ton coversTons per 100 sq ft
12 inches≈ 17 sq ft5.7
18 inches≈ 12 sq ft8.6
24 inches≈ 9 sq ft11.5

Placement details for stable stone

  • Install a base before the rock: use non-woven geotextile or 3-4 inches of #4 stone. Riprap placed directly on soil can appear stable for a season, then settle when the underlying bank erodes away.
  • Set the toe below the waterline or expected scour depth by burying the lowest stones. Failures commonly begin at the bottom of a riprap bank.
  • Before placing stone, shape the slope at 2:1 or flatter. A steeper bank needs engineering review rather than added rock.
  • Use hand placement or equipment on the exposed top course, fitting stones together so they interlock rather than stopping where they roll.
  • For a culvert outlet, carry the apron 4-6 pipe diameters beyond the discharge point downstream, where scour develops.

Example: 50 feet of pond bank

A shoreline with a 6-foot bank face and 50 feet of length measures 300 square feet. For an 18-inch layer: 300 x 1.5 = 450 cubic feet = 16.7 cubic yards, or about 26 tons of riprap and 27 with the small allowance. Include a roll of geotextile, or use about 4 tons of #4 stone as rock bedding. Review the truck access before ordering. The final 20 feet to a pond bank can catch a loaded truck, and relocating stone twice costs twice.

Following the first heavy storm

After water recedes, make a pass along the bank. Check the toe for displaced rock, exposed soil in the cover, visible fabric, and erosion at the outfall apron. Put shifted stone back in place and use reserve material to fill shallow areas. A short check a few times each year helps keep the riprap layer in order.

Stone size classes

Select riprap size for the water's force. Four to eight inch stone works on pond banks, downspout outfalls and slow streams. Use eight to twelve for lake shorelines subject to boat wake and quicker channels. Highway and spillway work has project-specific stone classes and depths, so follow the drawing rather than this page. If two sizes seem possible, use the larger stone with a thicker layer; added weight offers greater resistance.

Riprap quantity, sizing and placement

How can I estimate the rip rap needed?
Take the slope-face area, multiply by layer thickness in feet, divide by 27, and multiply by 1.55. For a 10 x 10 sample area at 12 inches, that equals 37 cubic feet or about 2.1 tons.
What coverage comes from 1 ton of riprap?
Plan for about 17 square feet with a 12-inch layer and 12 square feet with 18 inches. As a budget estimate, allow 5.5 to 6 tons for each 100 square feet at the standard layer.
What volume is 1 ton of rip rap?
The pile is about a cubic yard less one-third, similar in volume to a washing machine, and contains 25-35 stones at the 6-8 inch size. It can look modest in a pile, but at proper depth it covers a 4 x 4 section of bank.
What is the cost of 1 ton of rip rap?
Riprap costs more than construction stone and is priced by size class. The current amount appears on our RipRap product page, with delivery free. Fabric and bedding stone add a fraction more, so include them in the system.
What layer depth is needed for rip rap?
Use a depth equal to one and a half to two times the largest stone dimension, never less than 12 inches. For typical 4-12 inch residential material, allow 12-18 inches; larger stone or faster water may call for 24.
Is hand placement possible for rip rap?
For stone up to about 6-8 inches, hand placement is possible with gloves and physical effort, though a ton means 25-35 individual lifts. Larger material calls for machinery. A skid steer can position in an hour what a crew may hand-place in a day.

Plan the bank protection.

RipRap is available by the ton with free delivery, with #4 bedding stone available for the layer below it.

Shop RipRap

Choose material for the estimated volume